Our Projects
St Brendan’s College
Hutchinson builders
Excavation of Pile caps

Aurizon Carpark
RMS
Trim carpark area to grade with excavation of trenches for electricians and civil stormwater installation

Leichhardt Hotel
RMS
Excavation of pad footings with installation of blinder, cages.

Mercy Aged Care Carpark
Paynters
Condition, place and trim CBR for new asphalt carpark.

Teys Meatworks Entry Widening
RMS
Place and trim CBR for kerb prep.

Browne Park Stadium
Hutchinson Builders
Place crusher dust in post tension voids.

Browne Park Stadium
Hutchinson Builders
Dry hire of our water trailer with batter sprays for dust suppression onsite.

TEYS Meatworks
Besix Watpac
Importation and placement of CBR with compaction ready for blinder and footings.

Bega Milk Facility
Flynn Group Projects
Concrete removal, excavate to height and remove spoil for new concrete crossover.

Teys Meatworks
RMS
Rockbreaker making short work for removal of existing footing to make way for new footings.

Teys Meatworks
RMS
CBR spread and rolled ready for screw pile installation.

TEYS Meatworks
Topend Structures
Excavation of footings against sheet piles and sub grade for slab. Access ramp in for concreters.

Browne Park Stadium
Hutchinson Builders
Installation of Geofabric and rock to bridge out of soft ground.

Fletcher St Units Gladstone
Bryant Building Contractors
Detailed excavation of strip footings.

Fletcher St Units Gladstone
Bryant Building Contractors
Our time onsite consisted of, demolition and removal of trees and fencing, site cut and removal of unsuitable fill, construction of retaining wall, import and compaction of controlled fill, detailed excavation of footings, electrical trenching, site access and general site cleanups.

Ridgelands Arena
Neil R
Removal of vegetation ready for import of sand for horse arena.

Stanwell drainage
Georgie C
Concrete pipe and headway installation with rock head walls.

St Brendan’s College
Hutchison Builders
Excavation of stepped footings for pre cast panel retaining wall.

St Brendan’s College
Hutchinson Builders
Cleanup with bored piles rig and removal of spoil.

Leichhardt Hotel
RMS
Installation of concrete for pad footings.

Teys Meatworks Entry Widening
RMS
Excavate and remove spoil for new kerb prep and installation.

Teys Meatworks Entry Widening
RMS
Backfill behind kerb and reshape hill ready for turf reinstatement.

Browne Park Stadium
Hutchinson Builders
Quick touchup on crawler crane pad after placing 75mm ballast.

TEYS Meatworks
Besix Watpac
Excavation and removal of unsuitable material with placement of Geofabric and rock to bridge out.

Browne Park Stadium
John Goss Electrical Projects
Excavation and removal of spoil for new pad mount. Removal of concrete and excavation of trenches for electrical lead ins with backfilling and preparation for concrete reinstatement.

Browne Park Stadium
Hutchinson Builders
Aerial shot of 50mm blinder going down after our subgrade prep with batters, terracing levels and wet area set downs.

Teys Meatworks
Topend Structures
Finding weird and wonderful things underground during excavation and removal of spoil for footings joining existing shed slab and new shed slab.

Gracemere shed
Pepe W
Spread granite for entrance to shed.

Browne Park Stadium
Hutchinson Builders
Excavation of temporary site access.

Browne Park Stadium
Hutchinson Builders
Placement and compaction of CBR for hundreds of trucks to run over during construction process.

Fletcher St Units Gladstone
Bryant Building Contractors
Import of controlled fill compacted and tested in layers for building pad.

Barmaryee subdivision roadworks
Six8 Australia
At this turning lane into a subdivision saw us place 2.1 roadbase ready for a 2 coat seal.

Gracemere Poly line trenching
Anonymous
Trenching and installation of poly line for horse troughs.

Contact us
Based in Central Queensland, but we work anywhere needed.