top of page
CDB Civil excavation and earthmoving equipment in Rockhampton, Central Queensland

Our Projects

St Brendan’s College 
Hutchinson builders 

Excavation of Pile caps

IMG_3146.heic

Aurizon Carpark 
RMS

Trim carpark area to grade with excavation of trenches for electricians and civil stormwater installation

35827A5B-1054-44B9-A0EB-4990EEA6952F.jpeg.jpg

Leichhardt Hotel 
RMS 

Excavation of pad footings with installation of blinder, cages.

IMG_3017.heic

Mercy Aged Care Carpark 
Paynters

Condition, place and trim CBR for new asphalt carpark.

IMG_2946.heic

Teys Meatworks Entry Widening 
RMS 

Place and trim CBR for kerb prep.

IMG_2904.heic

Browne Park Stadium 
Hutchinson Builders

Place crusher dust in post tension voids. 

IMG_2849.heic

Browne Park Stadium 
Hutchinson Builders 

Dry hire of our water trailer with batter sprays for dust suppression onsite.

IMG_2803.heic

TEYS Meatworks 
Besix Watpac 

Importation and placement of CBR with compaction ready for blinder and footings. 

IMG_9244.heic

Bega Milk Facility 
Flynn Group Projects 

Concrete removal, excavate to height and remove spoil for new concrete crossover.

IMG_2746.heic

Teys Meatworks 
RMS

Rockbreaker making short work for removal of existing footing to make way for new footings. 

IMG_2664.heic

Teys Meatworks 
RMS 

CBR spread and rolled ready for screw pile installation.

IMG_2635.heic

TEYS Meatworks 
Topend Structures 

Excavation of footings against sheet piles and sub grade for slab. Access ramp in for concreters. 

IMG_2502.heic

Browne Park Stadium 
Hutchinson Builders 

Installation of Geofabric and rock to bridge out of soft ground.

IMG_2483.png

Fletcher St Units Gladstone 
Bryant Building Contractors 

Detailed excavation of strip footings.

IMG_2478.png

Fletcher St Units Gladstone 
Bryant Building Contractors 

Our time onsite consisted of, demolition and removal of trees and fencing, site cut and removal of unsuitable fill, construction of retaining wall, import and compaction of controlled fill, detailed excavation of footings, electrical trenching, site access and general site cleanups.

IMG_2480_edited.jpg

Ridgelands Arena 
Neil R 

Removal of vegetation ready for import of sand for horse arena. 

image0.jpeg

Stanwell drainage
Georgie C

Concrete pipe and headway installation with rock head walls.

IMG_1492.heic

St Brendan’s College 
Hutchison Builders

Excavation of stepped footings for pre cast panel retaining wall.

IMG_3104.heic

St Brendan’s College 
Hutchinson Builders

Cleanup with bored piles rig and removal of spoil.

60634B73-A1FF-4198-9EA5-9CC910FB0C8C.jpeg.jpg

Leichhardt Hotel 
RMS 

Installation of concrete for pad footings.

IMG_3025.heic

Teys Meatworks Entry Widening 
RMS

Excavate and remove spoil for new kerb prep and installation.

IMG_2897.heic

Teys Meatworks Entry Widening 
RMS 

Backfill behind kerb and reshape hill ready for turf reinstatement.

IMG_2919.heic

Browne Park Stadium 
Hutchinson Builders 

Quick touchup on crawler crane pad after placing 75mm ballast. 

IMG_2811.heic

TEYS Meatworks 
Besix Watpac

Excavation and removal of unsuitable material with placement of Geofabric and rock to bridge out.

IMG_2768.heic

Browne Park Stadium 
John Goss Electrical Projects

Excavation and removal of spoil for new pad mount. Removal of concrete and excavation of trenches for electrical lead ins with backfilling and preparation for concrete reinstatement.

IMG_2759.heic

Browne Park Stadium 
Hutchinson Builders 

Aerial shot of 50mm blinder going down after our subgrade prep with batters, terracing levels and wet area set downs.

dji_fly_20250224_104922_188_1740358182064_photo_optimized.jpeg

Teys Meatworks 
Topend Structures

Finding weird and wonderful things underground during excavation and removal of spoil for footings joining existing shed slab and new shed slab.

IMG_2679.heic

Gracemere shed 
Pepe W

Spread granite for entrance to shed.

IMG_2530.heic

Browne Park Stadium 
Hutchinson Builders

Excavation of temporary site access.

IMG_2481.png

Browne Park Stadium 
Hutchinson Builders 

Placement and compaction of CBR for hundreds of trucks to run over during construction process. 

IMG_2485.png

Fletcher St Units Gladstone 
Bryant Building Contractors

Import of controlled fill compacted and tested in layers for building pad.

IMG_2084.heic

Barmaryee subdivision roadworks
Six8 Australia

At this turning lane into a subdivision saw us place 2.1 roadbase ready for a 2 coat seal.

dji_fly_20241016_151920_182_1729055965757_photo_optimized.jpeg

Gracemere Poly line trenching 
Anonymous

Trenching and installation of poly line for horse troughs.

dji_fly_20240217_135656_156_1708142223695_photo_optimized.jpeg

Contact us

Based in Central Queensland, but we work anywhere needed.

bottom of page