Civil construction and earthmoving works delivered across Central Queensland and beyond.
Hutchinson Builders
Excavation of pile caps.
Hutchinson Builders
Excavation of stepped footings for pre cast panel retaining wall.
Hutchinson Builders
Cleanup with bored piles rig and removal of spoil.
RMS
Trim carpark area to grade with excavation of trenches for electricians and civil stormwater installation.
RMS
Excavation of pad footings with installation of blinder and cages.
RMS
Installation of concrete for pad footings.
Paynters
Condition, place and trim CBR for new asphalt carpark.
RMS
Excavate and remove spoil for new kerb prep and installation.
RMS
Place and trim CBR for kerb prep.
RMS
Backfill behind kerb and reshape hill ready for turf reinstatement.
RMS
CBR spread and rolled ready for screw pile installation.
Besix Watpac
Excavation and removal of unsuitable material with placement of geofabric and rock to bridge out.
Besix Watpac
Importation and placement of CBR with compaction ready for blinder and footings.
Topend Structures
Excavation and removal of spoil for footings joining existing shed slab and new shed slab.
Topend Structures
Finding weird and wonderful things underground during excavation and removal of spoil for footings.
Hutchinson Builders
Place crusher dust in post tension voids.
Hutchinson Builders
Quick touchup on crawler crane pad after placing 75mm ballast.
Hutchinson Builders
Dry hire of our water trailer with batter sprays for dust suppression on-site.
John Goss Electrical Projects
Excavation and removal of spoil for new pad mount. Removal of concrete and excavation of trenches for electrical lead ins with backfilling and preparation for concrete reinstatement.
Pepe W
Spread granite for entrance to shed.